Preliminary work on the foundations project will commence 1 November 2018. Until then, Bladt Industries will initiate a design optimisation process together with Parkwind and Jan De Nul with the aim of lowering the cost of the foundations.
This design optimisation process is in line with Bladt Industries’strategic focus on contributing to lowering Cost of Energy. Amongst other initiatives, Bladt Industries has developed a concept called ’Design for Manufacturing and Assembly’ with the intention of reducing the overall cost of foundations.