The last load out of Gode Wind
Because of an excellent cooperation between DONG Energy, GeoSea and Bladt Industries, we managed to complete the last load out before originally scheduled...
The Gode Wind 2+1 project has been well under way for almost 1½ year now, and on 31 August 2015, the last load out took place at our facilities in Aalborg, Denmark.
The 97 transition pieces for the project were fabricated at our facilities in Aalborg, Denmark, whereas the monopiles were fabricated by EEW SPC in Rostock, Germany.
The complete project has been a success. Timing is everything. Because of an excellent cooperation between DONG Energy, GeoSea and Bladt Industries, we managed to complete the last load out before originally scheduled.
Everyone involved worked with the same goal in mind – to make a success – and we succeeded with this goal.