Transition pieces
In addition to the substation, Bladt Industries fabricated the 72 transition pieces for the Sandbank offshore
wind farm. Fabrication of the transition pieces took place at our Aalborg fabrication site in Denmark.
Manufacturing was initiated as scheduled in third quarter of 2014, and by the end of 2015, the last transition piece was sailed away from our site in Aalborg.