Baltic Power

Poland (2 x 570 MW)

Reference

ORLEN Group and Northland Power Inc. have awarded the EPCI contract to Bladt Industries and Semco Maritime for the two offshore substations for the Baltic Power offshore wind farm project after naming the consortium a Preferred Supplier in September 2022.

The monopiles and transition pieces for the two substations will also be supplied by Bladt Industries.

Following the EPCI contract signing, the consortium of Semco Maritime and Bladt Industries, supported by ISC Consulting Engineers, have initiated the execution of the project by proceeding with the detailed design, procurement, construction and commissioning of the two offshore substations.

The Baltic Power wind farm will be erected approx. 23 kilometres off the shore, near Łeba and Choczewo. When completed, the Baltic Power offshore wind farm will be able to supply more than 1.5 million households with clean power.

FACTS 

Client:

A joint venture of ORLEN Group and Northland Power Inc

Year:

2026

Location:

Poland

Scope:

Design and fabrication of 2 x Substations, 2 x MPs and 2 x TPs

Output:

1,140 MW

Weight:

2 x 2,500 t + MP 2 x 1,600 t + TP 2 x 600 t

Type of contract:

EPCI