The German energy company RWE has chosen Bladt Industries to design and fabricate the platform for its offshore wind farm Nordsee Ost. The 1,800 tonnes substation was an exciting challenge for Bladt Industries to complete, as the goal was to finalise the project within 16 months – a very short time frame to conduct a project of this calibre.
However, close cooperation and efficiency between Bladt Industries and the client RWE enabled Bladt Industries to finish the substation in due time. Hence, as scheduled, Nordsee Ost left Bladt Industries on the barge Tuesday, July 15 2014. The substation has now been installed in the final destination in the German North Sea.
Client:
RWE
Year:
2014
Scope:
Design and fabrication of one offshore substation
Output:
295 MW
Weight:
1,800 t
Type of Contract:
EPC